We have made several changes and are up to our 4th home proposal. We have hopefully made our final selections/ changes to sign our 5th copy. We are due to get this back on the 11th July.
Our final selections/ upgrades include the following:
Upgrade face brick: 1st floor Façade only – Blue Steel Flash (Cat 8)
Rest of house – Moon Dust (Cat 2)
Upgrade motor to off white to the façade
Upgrade to the Timber Stacker Doors to include a provision for fly screens
Add cavity sliding doors to the Living
Under stairs storage
Upgrade the internal doors to Corinthian Deco 3D doors
Upgrade the wardrobe doors to bi-fold doors in bed 2, 3 & 4
Add Pot drawers in the kitchen
Upgrade the staircase at the top of the stairs to stainless steel balusters in lieu of the standard plaster lined wall
Add drawers to the Ensuite vanity
Tiled niche in the Master Ensuite and Bathroom
Upgrade the rain shower in the Master ensuite
Upgrade bath to the large bath
Cold water point behind the fridge
We have included a $9k allowance for electrical, this will include the purchase of all the fans, we are having one in every room. We are hoping we can go to our electrical appointment the same day as signing the contract.
The following is being done by 3rd party contractors after handover:
Complete ducted aircon
Swimming Pool
Render to the 2nd floor (façade only)
Carpets
Tiles
Driveway
Concrete for the Alfesco aera, stencilled around the pool, and the washing line area
Landscaping
Plantation was good enough to let us do our colour appointment before we signed our Home Proposal to save time, because the land had not been registered. I will post some pictures of our colour choices in my next post.
hi there
ReplyDeletemy name is jess, just wondering how your build went with plantation??
Hey excited stuff precise substance your response on.
ReplyDeleteneeta singh
This article gives the light in which we can observe the reality. This is very nice one and gives indepth information. Thanks for this nice article.
ReplyDeleteducted air conditioning